Green Hill School Progress

Gr Hill 23 /12/15 

Photo above: to the right of the school sign, the first shelter is the temporary church with a silver plastic tarp for a roof and behind the church is a new green metal roof building. The green roof building is the new 3 room classroom building for the primary school. Cyclone Pam destroyed the church and school in March.

I was very excited on December 23, to go up to Green Hill Teouma and check on the progress of the new building. Since the rains have started, the road to Green Hill is an hour long 4 wheel drive mud adventure. A group of nine men have been working for a several weeks on the new school building and I was anxious to see what they had accomplished since my previous visit.

IMG_5664 IMG_5697

IMG_5668  IMG_5665

The roof is on!

It has been a challenge to build so far off the main road. Most hardware stores and suppliers will not deliver to Green Hill so we have had to use a 4WD pick-up truck to haul materials. We started in November pouring the concrete slab in severe drought conditions, which necessitated the hauling of water from 45 minutes away to mix the concrete. Then when we got ready to put on the roof, the rains started and the road is now flooded! We are happy for the rain as the community had emptied their drinking water tanks!

To this point, the new school building has been financed by ACCIR in Australia. We are so grateful for their partnership. The siding for the building and doors have already been purchased but we are lacking funds for some important items to finish it:

US$3000 – one more month of worker’s salaries

US$700 – masonite sheets for the ceiling

US$700 – timber for knockings

US$1200 – louvre window frames and glass

US$2000 – wood primer and paint

Please label donations for Green Hill School Project #5778 if you are donating through AGWM. Thank you!

 

To The End Of The Road…

Rangorango Since Cyclone Pam struck in mid-March, I have found myself going to the end of so many roads. Roads I never really paid attention to. Roads I never thought went anywhere. These roads have taken me to hundreds of people I never knew existed, living in small settlements tucked away in the hills, all within an hour of Port Vila.

On Sunday, we were able to go to the end of yet another road and visit the people of Rangorango.  Pastor Charley Job (JBI grad) has supported this new church plant and wanted us to see it. He sent a 4 wheel drive vehicle to pick us up as the road is not very good.

an AG church on hill

The pastor of the Rangorango church, is a 2013 JBI graduate, Pastor David Willie.  The people living in these hills are from his home island of Tanna and the majority of them are truly unreached.

It sounded like a short drive, “just follow the road to the end of the airport runway and go up the hill.” But to get to the Rangorango church, you keep driving up and over many high hills and sliding through some muddy low areas. When you are almost at end of the road, you turn off into the tall grass and keep going until you get to a big tree. We parked there and walked down a path. Sitting high on the side of a hill is a clearing with a large shelter covered in various colors of plastic sheeting and a small house, this is the Assemblies of God church. It was so wonderful to see Pastor David and within minutes, people started appearing from different directions until the church was full.

Preaching at Rangorango AG churchThe church shelter had recently been rebuilt along with a small one-room house for the pastor and his family. Everything had blown away in the cyclone and recovery has been slow.

Gary had already preached on the radio that morning at 8 a.m. but he was happy to preach again. We had a wonderful service and several came forward for prayer.

Rangorango church

After service, I was asked to make an address on the importance of education, a first for me. Pastor Charley Job is very concerned because there is not a school anywhere in these hills. The children either have to be sent to live with relatives elsewhere to attend school or they stay home and miss out. The families connected to this small church alone have at least 50 children amongst them. The community needs at least a kindergarten. Pastor Charley has started schools elsewhere and wanted me to encourage them to start a kindergarten.

Children of Rangorango

After a lovely lunch, we headed back to town.

Later the community had a meeting and it was decided to start a kindergarten at the church in 2016. This will be a wonderful way for the church to reach out to all the children in this area.

They will build a one room schoolhouse and look within their community for a teacher. Pastor Charley and the Green Hill Primary School will help them organize and we want to help them with some basic furniture and school supplies.

Will you help us provide some basic school supplies for the children of Rangorango?

Green Hill Teouma School Rebuild – First Phase

I was so impressed when I visited the primary school at Teouma Green Hill on the 22nd of April 2015. It had only been a few weeks since Cyclone Pam had devastated the southern half of the country. The upper Teouma farming community had been destroyed by the category 5 cyclone. The Green Hill School, started by Pastor Charley Job, had lost every building, most of their furniture, and books to the violent winds. But the headmaster had rallied his teachers and the community and by April 22nd they were back in class. This was truly a remarkable sight as teachers propped their blackboards on the ground and students huddled together on the grass to do their lessons. A hodgepodge of donated plastic tarps provided a roof over each class. It was an amazing effort to move on after an unprecedented disaster and I knew that others would want to assist and encourage such resilience.

Green Hill 22 April Teacher Gr Hill

The first commitment to finance a new class building for these children came from the Australian Christian Churches International Relief (ACCIR) and I am forever grateful to them for their partnership and trust. A building plan for a simple 3 classroom building was drawn up and paperwork signed.

Once the funds were in hand, the process of purchasing the materials and getting them up the 4WD bush road began. The delivery process took much longer than expected. Most local businesses did not want to send their delivery trucks off road. A big thank you to MCI for being the only coral and sand distributor willing to deliver all the way to the school site. Wilco Hardware and Bluescope Roofing also graciously delivered. But for the remaining tons of materials, cement, wood, rebar, and eventually water, local pick-up truck drivers had to be hired to make the deliveries.

A couple of months after Cyclone Pam, Vanuatu was hit by an ElNino drought and all rain ceased. Most people in Vanuatu are not connected to a water supply but rather depend on catching rainwater. The prolonged drought greatly improved the delivery conditions of the road to Teouma which most of the time is a slippery, rutted four wheel drive mud road. On the hand, the drought has prevented the market gardening community of Teouma from regaining its normal cash income and caused great hardship. Crops were replanted promptly post-cyclone but the harvest has been meager.

On November 23, 2015, reconstruction officially started on the Green Hill Primary school. The community had fundraised to purchase tools, buy fuel for the generator to run the cement mixer, and host temporary construction workers.

Cement slab Gr Hill Construction at Gr Hill

Everyone had been stocking water in tanks and containers to use in the pouring of the cement floor. The water on hand ran out half way through pouring the cement slab. Again the community rallied by filling water containers at a nearby lake and bringing it to the worksite. The workmen continued to mix cement as the people brought water. The cement slab was finished this past week. The rest of the building is a wood construction so there will be less need of water.

If you would like to assist the rebuilding of the Green Hill Primary School, we are currently needing funds to buy school desks and chairs. A second classroom building will also be started in early 2016 and about $40,000 US is needed.

Internet Problems

For months we have had ongoing problems with our internet service. We changed internet providers and then went back to our original provider. There is an overall technology problem in the city and it is beyond our control at this point. We hope that the system will improve in 2016. In the meantime, our email capabilities have been reduced to sometimes one brief connection per day. Internet browsing has become a rare event and loading a photo to our blog or even FB basically impossible. There is so much that has been happening and we are so anxious to share it with you. We apologize for the lack of update on our website.

Internet Problems

For months we have had ongoing problems with our internet service. We changed internet providers and then went back to our original provider. There is an overall technology problem in the city and it is beyond our control at this point. We hope that the system will improve in 2016. In the meantime, our email capabilities have been reduced to sometimes one brief connection per day. Internet browsing has become a rare event and loading a photo to our blog or even FB basically impossible. There is so much that has been happening and we are so anxious to share it with you.